On behalf of Bankstown Airport C/- ALTIS, Forge Venture Management engaged INTREC to undertake the procurement and installation of a new colourbond roof, as well as a major compliance upgrade of Building C, Site 533 at Bankstown Airport. Minor interior works to the doors and windows, as well as the removal of timber flooring were also included.
Our team conducted a make good of the existing internal facility, including the installation of new DDA compliant concrete ramps and handrails, alongside the installation of bollards and signage. Updated safety features were also installed, including new emergency exit signs and lights. During the replacement of the roof on Building C, our team were required to manage the removal of existing asbestos box gutters and remnant asbestos sheeting. This process was undertaken in a safe manner and in accordance with Workplace Health and Safety regulations, Safe Work, and Australia’s Code of Practice.
Our team is well versed in operating within live surrounding environments, ensuring that our works created minimal disruptions to the daily operations of the airport. Considerations of dust protection, cranage and plant movements were all made in the early stages of planning to ensure the project was delivered safety and to a high standard.