INTREC successfully delivered the design and construction of a staged hospital refurbishment at Cabrini Malvern.
Delivered within a live environment, the works were divided into three zones; the Basement Plant Platform, two Operating Theatres on Ground Floor and Level 1 offices and staff spaces.