On behalf of Bankstown Airport C/- ALTIS, Forge Venture Management engaged INTREC to undertake the procurement and installation of a new colourbond roof, as well as a major compliance upgrade of Building C, Site 533 at Bankstown Airport. Minor interior works to the doors and windows, as well as the removal of timber flooring were also included. Our team conducted
INTREC were engaged by GPC Asia Pacific to carry out the fit out of their new Asia Pacific head office and distribution centre in Brisbane. The office works entailed building new corporate offices, utilities, an open plan workspace to cater for in excess of 130 employees, reception area, large communications room, industry specialty rooms, and also to build a new
INTREC was engaged by Integrity Project Management on behalf of Mantra Group for the design and construct of an external entertaining area at Mantra on View Hotel. Located in sunny Surfers Paradise in Queensland, Mantra on View is positioned just 160m from the beach and offers accommodation, a gym, conference spaces, restaurant facilities and a rooftop deck overlooking the ocean.
INTREC was appointed to carry out the refurbishment of Ramsay Health Care’s Pharmacy located within the lobby area at Greenslopes Private Hospital. Throughout the refurbishment INTREC was required to maintain an operational section of the pharmacy to allow continued trading. This meant careful management, clear site boundaries to ensure public safety, and maintaining building services supplies at all times. The
INTREC were approached by Arcadis to complete works on HSBC shopfront in the heart of Wynyard Station. New shop-front glazed bi-fold doors slide into concealed storage, disguised by a timber batten feature wall. The new HSBC shop-front comprises new services including; mechanical, fire, security, AV and electrical. The fitout also contains new joinery, a Digibar island for client consultation, custom
Located within Doncaster Westfield’s Shopping Centre, INTREC were engaged by Alpha Project Management on behalf of HSBC Bank to complete an internal fitout of a new branch. The project was completed in an empty shell within the Shopping Centre. Scope of works for the Doncaster branch involved structural steel and timber works, shop front glazing, walls and ceilings including steel
HSBC Bank Australia required an existing shop-front comprising two shop-lots to be stripped out and fitted for a new branch along Burke Road in Camberwell. The new branch consisted of new designs, furniture, updated systems and signage in line with HSBC standards. The existing shop-front was demolished and stripped out to make way for the new HSBC branch. The new
AIG required a full floor refurbishment of their Australia head office located in 2 Park Street, Sydney. As the entire floor was fully tenanted the refurbishment was required to be carried out in two stages. The main project works included the installation of new flooring and ceiling tiles throughout, new kitchen area, full lighting and air conditioning upgrade, new reception
INTREC worked alongside Artazan Property Group and Davenport Campbell & Partners to deliver the new KPMG Australian Services office fit out in Wollongong. A vital responsibility when carrying out this project was for INTREC to engage the service consultants, Evolved Engineering to complete a detailed management of the design and installation for all services (excluding AV and security) and to
INTREC were engaged with the Electrolux Experience Centre in Mascot NSW. Electrolux is a global leader in home appliances, based on deep consumer insight and developed in close collaboration with professional users. With a strong history of industrial design and innovation over 90 years, the group of esteemed associated brands, sells more than 60 million products to customers in more