InvoCare is an international company that operates funeral homes, cemeteries and crematoria around Australia, New Zealand and Singapore. INTREC was engaged as head contractor, to deliver this project for Invocare Bankstown working alongside APP and Invocare to deliver a space fit for funeral planning and funeral services. This project consists of two main elements: the new build construction of an
The project brief was to turn an existing storage warehouse in to a world class training centre where 3M can train consumers of their products in the correct use and application. The building works involved a new 650m2 concrete topping slab to the existing warehouse floor and the replacement of the factory’s external mall sheeting. The fitout component of this
GHD was seeking a modern, sustainable, and digitally enabled office space to complement its collaborative and diverse workplace culture. GHD engaged INTREC to conduct their three-staged interior refurbishment across Levels 12, 14 and 15 of its existing office space, located on Castlereagh Street in Sydney’s CBD. This three‐floor office refresh included the demolition of the existing fit out
As part of a large-scale roll-out of Kids Club Childcare, INTREC completed the construction and fit-out refurbishment of a 90-place childcare centre in Rosebery NSW. This particular 20-week roll out involved the transformation of an industrial building into a “Kid Friendly” two-floor building. The Childcare Centre featured two outdoor play areas, including state of the art play equipment, bike tracks
INTREC were engaged by Pure Projects on behalf of ISPT to undertake a new extension to the Taylors Hill Shopping Centre. Project works entailed the provision of a new warm shell extension to an existing Medical Centre tenancy, as well as associated external façade works and Landscaping. New pad site works were then undertaken to the location of a new
The Pullman on the Park Hotel is located adjacent to the iconic MCG, with spectacular views of Melbourne. This project entails the complete refurbishment of 419 Guest rooms including the Executive Suites and the William Clarke Suite. In addition, the refurbishment extends across the Lobbies, Corridors and Executive Lounge with an extensive upgrade to perimeter windows and base-build services. Initially
INTREC were engaged by Mulpha at an ECI capacity to deliver the multistage Townhome development in Sydney’s Norwest District, ‘Essentia’. Mulpha Group (Mulpha) is one of Australia’s most experienced real estate and hospitality investors, committed to creating extraordinary places. INTREC partnered with Mulpha to deliver a new generation of Luxury Townhomes. Essentia Stage 2 required the construction of 15 residential
INTREC worked with GrayPuksand, Venko Design, Erbas Consultants and Wood & Grieve Engineers (now Stantec) to undertake refurbishment works at Caulfield Grammar School Wheelers Hill Campus, transforming it into a place for creativity and innovation. With the outcome of the project dictated by aesthetic measures, INTREC was able to offer fit for purpose alternatives to achieve practical building methodologies, while
INTREC were engaged by Schools Infrastructure NSW (SINSW) in a Design and Construct capacity to carry out two new build projects at Prestons Public School. SINSW is currently conducting $6 billion worth of upgrades within schools across NSW. This funding is set to deliver 170 new and upgraded schools, inclusive of the project currently underway at Prestons Public School. INTREC’s
RMIT University and Root Partnerships sought an experienced Head Contractor to deliver complex upgrades within Level 4, Building 7 of its City Campus. The project was comprised of three major components: nitrogen pipework upgrades, the installation of a new Low pressure Chemical Vapour Deposition (LPVCD) system and the installation of an Electron Beam Lithography System (E-Beam). The Nitrogen pipework upgrades