In December 2019, Burwood Council engaged INTREC to deliver the fitout works for their Administration Office, Library and Community Hub at 2 and 8 Conder Street, Burwood. INTREC delivered the project scope within 15 weeks across the two sites, including design finalisation, lead-time management and COVID-19 site measures. Works included the strip out, reconfiguration and refurbishment of the library
INTREC were engaged by Fitness First to carry out the refurbishment of approximately 24 gymnasiums nationwide as part of their rebranding program. The existing blue logo has been replaced with a new red ‘F’ logo, which is said to symbolise “passion, energy and strength”. The design incorporated in these gymnasiums was the first of its kind, which is to be
On behalf of Bankstown Airport C/- ALTIS, Forge Venture Management engaged INTREC to undertake the procurement and installation of a new colourbond roof, as well as a major compliance upgrade of Building C, Site 533 at Bankstown Airport. Minor interior works to the doors and windows, as well as the removal of timber flooring were also included. Our team conducted
INTREC were engaged by GPC Asia Pacific to carry out the fit out of their new Asia Pacific head office and distribution centre in Brisbane. The office works entailed building new corporate offices, utilities, an open plan workspace to cater for in excess of 130 employees, reception area, large communications room, industry specialty rooms, and also to build a new
INTREC was engaged by Integrity Project Management on behalf of Mantra Group for the design and construct of an external entertaining area at Mantra on View Hotel. Located in sunny Surfers Paradise in Queensland, Mantra on View is positioned just 160m from the beach and offers accommodation, a gym, conference spaces, restaurant facilities and a rooftop deck overlooking the ocean.
INTREC was appointed to carry out the refurbishment of Ramsay Health Care’s Pharmacy located within the lobby area at Greenslopes Private Hospital. Throughout the refurbishment INTREC was required to maintain an operational section of the pharmacy to allow continued trading. This meant careful management, clear site boundaries to ensure public safety, and maintaining building services supplies at all times. The
INTREC were approached by Arcadis to complete works on HSBC shopfront in the heart of Wynyard Station. New shop-front glazed bi-fold doors slide into concealed storage, disguised by a timber batten feature wall. The new HSBC shop-front comprises new services including; mechanical, fire, security, AV and electrical. The fitout also contains new joinery, a Digibar island for client consultation, custom
Cbus Super Stadium is the Gold Coast’s premier entertainment venue Which seats 27,690 people. Owned by Stadiums Queensland, the stadium offers a range of facilities for the community to utilise. Stadiums Queensland appointed INTREC deliver works to Gate C & D Which Sits on the south eastern Side Of the stadium. The scope of works for this project included the
The St George and Sutherland Clinical School, UNSW Sydney (UNSW) engaged INTREC to undertake the refurbishment of Research Facilities on Level 2 of the Research and Education Centre, St George Hospital Campus. This fitout was within a live building with all major services running, with a library below and a similar laboratory facility above. The project included the fitout of
Victoria University (VU) required a head contractor with experience in asbestos removal to refurbish two existing classroom areas which were in two separate buildings, located at their main Footscray campus. The two new classrooms included a new state of the art Audio Visual system which Victoria University had not previously installed. The demolition of the existing walls and ceiling included