Frankston Hospital is the major provider of acute secondary and tertiary hospital services on the Mornington Peninsula. On behalf of Peninsula Health, INTREC Victoria, Lyons Architects, Bonacci Group, Watermans, Umow Lai and Steve Watson and Partners collaborated to extend the emergency department and create a 12 Bed Short Stay Unit. The site was located within the confined undercroft of Frankston
Waratah Private Hospital, as one of the most technically advanced hospitals, is committed to driving excellence in the care and recovery of their patients. The Rehabilitation Gym and Hydrotherapy Pool was just the next step in their vision to become the healthcare provider of choice in Australia and New Zealand. The gym involved the merging and transformation of two vacant
Brisbane’s Western Corridor is one of Queensland’s fastest-growing regions. Situated within the Western Corridor, Augusta State School was opened in 2011 with a student population of just under 300 students. By 2017, student population totalled over 878 with a catchment area that includes Augustine Heights, Brentwood Rise, Brookwater and small areas of Redbank Plains and Bellbird Park. On behalf of
Johnstaff Projects on behalf of West Gippsland Healthcare Group engaged INTREC to deliver the construction of a new eight bed Short Stay Unit (SSU), Third Operating Theatre (TOT) and 50-bay car park, as well as the design and implementation of a new Nurse Call System at Warragul Hospital, located in regional Victoria. Constructed on concrete columns, with a suspended concrete
Funded by Rail Projects Victoria (RPV), North East Link and West Gate Tunnel, INTREC were engaged by Holmesglen Institute to undertake the construction of a world-class training facility at their Drummond Street Campus in Chadstone. The Victoria Tunnelling Centre (VTC) is an Australian-first, providing Holmesglen with a state-of-the-art facility to educate and skill thousands of students in underground construction and
Under the NSW Government, NSW Transport Shared Services engaged INTREC to undertake the five-month construction of their new Joint Agency Facility at Tweed Heads. The new facility is to be the first build of a planned rollout of joint agency buildings on the NSW coast. The site is located directly on the Terranova Inlet in Tweed Heads, INTREC worked closely
INTREC were engaged by Monash Health to deliver the redevelopment of their MRI and CT scanner facilities within Dandenong Hospital. Carried out in two stages, the first stage involved the construction of a new CT Facility to allow for a new MRI machine. The second stage will include the placement of a new MRI, new fire compartments, lead lining surrounding
In preparation for a 19-Level refurbishment of existing Guest Rooms, Lobby areas, Suites, Executive Lounge and Penthouses at Pullman Melbourne on the Park, INTREC was engaged by Macroplan to undertake the Hotel’s early works. INTREC was initially engaged to complete one mock-up Guest Room for QM Pegasus, which involved the demolition of an existing room back to base, new service
In December 2019, Burwood Council engaged INTREC to deliver the fitout works for their Administration Office, Library and Community Hub at 2 and 8 Conder Street, Burwood. INTREC delivered the project scope within 15 weeks across the two sites, including design finalisation, lead-time management and COVID-19 site measures. Works included the strip out, reconfiguration and refurbishment of the library