INTREC was engaged by La Trobe University to redevelop Level 1 of the Health Sciences 1 Building at its Bundoora campus. The project included the demolition of the Ground Floor, followed by the fitout of a GP Clinic (Stage 1) and a Telehealth Facility (Stage 2). The GP Clinic works involved a main switchboard upgrade for the whole building, all
Spanning two levels and 1600 sqm, INTREC transformed the space with cutting-edge features, including 62 laboratory-grade workstations for four electrical labs, specialised areas for cell culture and microscopy, and a 600 sqm PC2 lab that meets the highest safety standards. The project features a laser room, an EMaD lab, 91 custom lab stations supporting eight types of lab gases, a gas
INTREC were engaged by Southern Metropolitan Cemeteries NSW (SMCNSW), to provide Early Contractor Involvement (ECI) services for the refurbishment, remediation and upgrading works of the Chapel and Crematorium Building at the Eastern Suburbs Memorial Park (ESMP) in Matraville and the Chapel Building at Woronora Memorial Park (WMP) in Sutherland. The ECI Services were later converted to a Design & Construct
On behalf of Schools Infrastructure NSW (SINSW), TSA sought INTREC to complete the Design and Construction of Major Works at North Rocks Public School. Our team worked closely with client-side project manager, TSA, and the school leadership team to deliver spaces that fulfilled the client’s needs. The project was handed over in two stages. The first stage included the refurbishment
INTREC was engaged by Lead Architects to deliver the fitout of Pacific Life Re’s new Sydney office located in the AMP Quay Quarter Tower in Sydney’s CBD. The 600m² tenancy included breakout spaces, meeting rooms, offices, and open-plan workspaces. Our team was responsible for the installation of detailed joinery, timber doors, and glazing jambs, as well as new supplementary mechanical
This project involved the fitout of a basement area to create a new department within the existing St Vincent’s Public Hospital. The department included a PET Scanner Room, Control Room, Radiology Hot Lab, office spaces, cancer treatment rooms, and an accessible bathroom. The scope of work included demolition, large-scale concrete pouring, extensive floor preparation, structural steel, timber frame walls, lead
Funded by Rail Projects Victoria (RPV), North East Link and West Gate Tunnel, INTREC were engaged by Holmesglen Institute to undertake the construction of a world-class training facility at their Drummond Street Campus in Chadstone. The Victoria Tunnelling Centre (VTC) is an Australian-first, providing Holmesglen with a state-of-the-art facility to educate and skill thousands of students in underground construction and
INTREC were engaged to improve the accessibility to the newly constructed buildings and the parking facilities to accommodate the growth of the school. This project included the new construction of the Central Ramp and the Northern Carpark, and upgrades to both Guillemont and Vinny Road entrances. Traffic control, pedestrian management and temporary fencing formed an important part of the project.
INTREC assisted Milperra Public School in the construction of their New Hall Project which included storage and stage facilities. Milperra Public School is a friendly primary school providing quality educational programs in a caring, supportive environment internally and to the wider community. This project included the construction of a new multi-purpose hall, catering for sports, PE, performance, amenities, and storerooms,
Dee Why Gardens is a retirement village containing independent living units and serviced apartments. INTREC was engaged to deliver the refurbishment of the Community Centre and Reception Building at Dee Why Gardens Retirement Village. The project included the refurbishment of the Community Centre, staff administration areas, dining rooms, and residential recreational areas, featuring a hair salon, billiard room, and cinema.