30
Jun

Yello for ABN AMRO – Sydney CBD

INTREC worked collaboratively with Colliers to complete a fitout for the Yello Centre at ABN AMRO, in Sydney. The project, comprising of high-end joinery, concretelook wall panelling, acoustic panels and a feature timber slatted ceiling, was successfully accomplished within the programme schedule. A new commercial style kitchen, equipped with double fridge/freezers and integrated appliances was installed, with the aim to

Read more

26
Jun

UNSW Sydney, St George & Sutherland Clinical School Medical Research Facilities

The St George and Sutherland Clinical School, UNSW Sydney (UNSW) engaged INTREC to undertake the refurbishment of Research Facilities on Level 2 of the Research and Education Centre, St George Hospital Campus. This fitout was within a live building with all major services running, with a library below and a similar laboratory facility above. The project included the fitout of

Read more

26
Jun

UNSW CQC2T Lab Expansion

The University of NSW is regarded not only as Australia’s leading research university in the dynamic field of quantum computing science but also as one of the global leaders in the race to build a quantum computer. The CQC2T Expansion Stage 4 project was the latest UNSW initiative to focus attention on the University’s progressive research, doubling their current capacity

Read more

26
Jun

University of Melbourne – BIO21 Lab

INTREC were engaged to construct a new PC2 Lab within the University of Melbourne’s Bio 21 Institute Building. Works were completed within a live laboratory environment, with strict hygienic and operational constraints. Works consisted of the construction of a PC2 compliant hoarding to encapsulate site, construction of the new lab room, installation of hygienic grade vinyl, joinery, chairs, doors, sinks

Read more

26
Jun

Victoria University – Building D & Building G Physiology & Physics Labs

Victoria University (VU) required a head contractor with experience in asbestos removal to refurbish two existing classroom areas which were in two separate buildings, located at their main Footscray campus. The two new classrooms included a new state of the art Audio Visual system which Victoria University had not previously installed. The demolition of the existing walls and ceiling included

Read more

26
Jun

RMIT University – Building 201 Medical Radiation Lab

INTREC were engaged by Root Partnerships to create a realistic laboratory environment, to be used as a teaching space at RMIT’s Bundoora Campus. Works were comprised of new mechanical, hydraulic and fire services, as well as new electrical works for the fitting of new Siemens X-ray equipment. Works also included the installation of structural steel to support this equipment, as

Read more

26
Jun

RMIT University – Building 223 ECP Director Labs

This project required a refresh to RMIT University’s existing Building 223, Module E laboratories. The labs were fitted with new services and joinery to meet new user requirements, and to maintain PC2 certification. Demolition works were carried out to the ceilings and joinery to accommodate the changes, and make way for new mechanical units to improve the negative pressure requirements.

Read more

26
Jun

RMIT University – Building 5 ECP Laboratory Fitout

INTREC were engaged by RMIT University and Root Partnerships to create two new ECP Laboratories within their City Campus. Project works consisted of two laboratory areas containing of numerous elements. The first lab involved the construction of a main wet chemical laboratory, including four fume cupboards, an exhaust sleeve, MilliQ water and 1D water, a photocatalysis laboratory (dark room) with

Read more

16
Jun

InvoCare Funeral Homes Rollout

Since 2017, INTREC has been engaged by InvoCare to refurbish and fitout their Funeral Homes and Shop Fronts throughout New South Wales, Victoria, Tasmania and Australian Capital Territory. The rollout, which is shared across three builders, consists of 250 projects including shop fronts, funeral homes, chapels and crematoriums. INTREC have been in close communication with the design team to ensure

Read more

3
Jun

UNSW Tyree Energy Technologies Laboratory

Located at The University of New South Wales, the TETB H6 building integrates flexible laboratory modules (including cleanroom working environments), a series of collaboration, teaching and learning spaces, and administrative offices, engineering workshops and engineering research laboratories. The Tyree Building houses 1300 m2 of SPREE research and support spaces spread over a number of laboratories on different levels – ranging

Read more