Port Augusta Regional Data Centre – 3MW

Port Augusta Regional Data Centre – 3MW

Location

SA

Sector

Technology and Innovation

Client

Ashur Digital Labs

Representative

Ashur Digital Labs

This project is on track for final commissioning and energisation by the second quarter of 2026. The site was selected for it’s proximity to renewable energy assets and is actually collocated on a future solar energy farm. This project draws on Intrec’s growing expertise in the design and development of small, regional data centres and modular data centres. Intrec utilised both in house and partner engineering expertise to design the electrical infrastructure required for the 33kV high voltage connection.