As part of their long-term vision for sport at the University, Monash University engaged INTREC to deliver a new Northern Pavilion at the University’s Clayton Campus. The project scope included the replacement of the existing Soccer and Tennis Pavilion with a new two-storey structure, servicing the tennis courts and new synthetic sport fields. The new Pavilion offers change rooms and
On behalf of Schools Infrastructure NSW (SINSW), TSA sought INTREC to complete the Design and Construction of Major Works at North Rocks Public School. Our team worked closely with client-side project manager, TSA, and the school leadership team to deliver spaces that fulfilled the client’s needs. The project was handed over in two stages. The first stage included the refurbishment
INTREC were engaged by Transport NSW to conduct a full tenancy upgrade at 27 Argyle Street Parramatta, which consisted of converting 11 Floors of conventional office spaces into a new Activity Based Working (ABW) Facility as well as a new end of trip facility. The ABW configuration was designed to provide a new open plan working environment, encouraging collaboration between
INTREC were engaged by the Moreton Bay Regional Council to complete an amenities refurbishment at the Albany Creek Leisure Centre, along with an upgrade to the existing swimming pool. The scope of works for this project included a full amenities refurbishment at the Lawnton Aquatic Centre, including the showers, toilets and changing rooms. The team also delivered a high specification
INTREC were engaged by Vicinity Centres to deliver a base build extension of the Keilor Central Shopping Centre. This included the removal and installation of precast panels and carpark civil works, as well as the installation of new sprinkler and fire hydrant. Works included the installation of a concrete slab to extend the Keilor Shopping Centre, removal of the existing
Hospitals Contribution Fund (HCF) Dental Centre sought an experienced builder to undertake a fitout for 12 surgery rooms, two OPG rooms, one Laboratory and one CSSU room for their new Dental Surgery at 410 Collins St, located in central Melbourne. Located at 410 Collins St, the works undertaken were over three levels and covering 650m2, which included twelve Surgery Rooms,
The Psychiatric Assessment and Planning Unit (PAPU) department, works in conjunction with the Emergency Department. This new facility was constructed on vacant land beneath the Level 1 undercroft, and included six bed with ensuites, a Nurse Station, Court Yard, Plant Room/ Breakout, Reception and Interview Rooms. Works included: demolition, civil, water proofing (for slab), concrete slab, structural steel, roofing, cladding,
INTREC had the pleasure of working alongside our longstanding client Arts Queensland on a fantastic project at the Queensland Performing Arts Centre. INTREC successfully delivered a refurbishment to the stage door entry including a new ramp and entry to the Cremorne Theatre. The scope of works included a two stage refurbishment to the Queensland Performing Arts Centre stage door entry.
INTREC QLD proudly delivered a Wellness Centre at the Ashmore Gardens Care Community. This project was successfully delivered on time within the 13 week programme. The scope of works included the conversion and infill of an unused hydrotherapy pool into a new Wellness Centre for residents to enjoy. The team also delivered a range of treatment rooms for the Opal
INTREC were engaged by Cabrini Property to reconfigure their Old Day Oncology Department at Cabrini Malvern into a new Cancer Institute and Exercise & Wellness Research Centre, with the aim to support cancer research and patient rehabilitation in the community. The works included a new Gymnasium rehabilitation space, office administration spaces, patient consulting and interview rooms, patient and family waiting